MOUNTAIN SKY INTERMEDIATE DISTRIBUTION FACILITY 2 (IDF2)
DETAILS

  - IDF2 Scheme

Moutain Sky IDF2 Details

  - IDF2 Details
      - The Intermediate Distribution Facility 2 (IDF2) must service 11 rooms requiring connection from Multi-Purpose Building and Portable Classrooms and must also assure backbone connection with MDF from East Building
        - The type of cable used to connect these 11 rooms is CAT 5 UTP - this is the Horizontal Cross Connect (HCC) cable
         - The type of cable used to connect IDF2 with MDF is Multimode Fiber Optic Cable - Backbone cable - Vertical Cross Connect (VCC) cable
       - For the 11 rooms we need (minimum requirements):
              - 11 cable runs for curriculum computers (11 x 1 Mb/s)
              - 11 cable runs for teachers' computers (11 x 10Mb/s)

  - MDF equipment used:
       - for the 11+11 connections the minimum required equipment is the following:
              - a Switch with 48 ports CAT 5 + 1 Fiber Optic capable port
              - a HCC Patch-Panel with 48 ports for curriculum network (VLAN3-VLAN48)
              - a HCC Patch-Panel with 24 ports for teachers network (VLAN2)
              - VLAN3-VLAN48 patch panel will be named HCC 4
              - VLAN2 patch panel will be named HCC 7

  - IDF Room details:
       -
The interior walls are painted with fire retardant paint and has 3/4" plywood which is raised 1 1/4" from the walls where equipment is mounted
       - 15 feet of wall space is provided for the POP terminations.
     - Drop ceiling should have fixed ceilings installed to prevent unauthorized access.
       - 12" ladder rack and 4" conduits installed for horizontal and vertical cabling.
      - Water and steam pipes should not run through or above the wiring closets and the humidity should be maintained between 30% and 50%.
       - HVAC should maintain the room temperature at 70 degrees F.
       - Incandescent lights have been installed

 