Cisco Networking Academy TCS - Mountain Sky School Project

 

Requirements

Wiring
map

MDF/IDF
details

VLANs

IP
addressing

Cable
runs

Router
config.

Security

Equipment
list

  Main Distribution Facility (MDF)  |  Intermediate Distribution Facility 1 (IDF1)  |  Intermediate 
  Distribution Facility 2 (IDF2)

 

MOUNTAIN SKY MAIN DISTRIBUTION FACILITY (MDF) DETAILS

  - MDF scheme

Mountain Sky School Project - MDF Details
* Note: In this picture VLAN3 is a general representation for VLANs used for curriculum network; we will use 46 VLANs for each subnet from curriculum network rooms, i.e. VLAN3 to VLAN48 will all be used for curriculum network and will be implemented on switches; also routing for subnetworks on each VLAN will be assigned using subinterfaces on Router

  - MDF details:
      - The Main Distribution Facility (MDF) must service the 11 rooms requiring connection from Building A East and must also assure connections for Intermediate Distribution Facilities 1 and 2 (IDF1 and IDF2)
       - The type of cable used to connect these 11 rooms is CAT 5 UTP - this is the Horizontal Cross Connect (HCC) Cable
       - The type of cable used to connect the 2 IDFs is Fiber Optic Multimode - this is the Vertical Cross Connect (VCC) Cable
       - For the 11 rooms we need (minimum requirements):
              - 11 cable runs for curriculum computers (11 x 1 Mb/s)
              - 11 cable runs for teachers' computers (11 x 10Mb/s)

  - MDF equipment used:
       - for the 11 cable runs the minimum required equipment is the following:
              - a Switch with 48 ports CAT 5 + 1 Fiber Optic capable port
              - a HCC Patch-Panel with 48 ports - for curriculum network (VLAN3-VLAN48)
              - a HCC Patch-Panel with 24 ports - for teachers network (VLAN2)
              - VLAN3 - VLAN48 Patch-Panel will be named HCC1
              - VLAN2 Patch-Panel will be named HCC5
       - for those 2 fiber optic backbone connections the minimum required equipment is:
             - a Switch with 2 Fiber Optic capable ports
             - a VCC Patch-Panel with 8 ports

  - MDF Room details:
       -
The interior walls are painted with fire retardant paint and has 3/4" plywood which is raised 1 1/4" from the walls where equipment is mounted
       - 15 feet of wall space is provided for the POP terminations.
     - Drop ceiling should have fixed ceilings installed to prevent unauthorized access.
       - 12" ladder rack and 4" conduits installed for horizontal and vertical cabling.
      - Water and steam pipes should not run through or above the wiring closets and the humidity should be maintained between 30% and 50%.
       - HVAC should maintain the room temperature at 70 degrees F.
       - Incandescent lights have been installed

 

| Main Page | Requirements | Wiring map | MDF/IDF details |
| VLANs | IP addressing scheme | Cutsheets | Router config |
| Security configuration | Details about the equipment used |
| Cisco TCS Mountain Sky Project - Semester 4 Configuration |